Jobber Field Service Software
Turn material takeoffs into professional good-better-best customer quotes with built-in margin tracking, automated follow-ups, and one-click deposit collection.
Pre-loaded supply-house takeoff quantities (6.79 cu yd (w/ 10% waste) · Ready-mix truck required), DIY material cost benchmark ($1,180–$1,550 (concrete only)), and turnkey contractor estimate ($4,200–$6,800).
Two-car garage slabs need 4,000 PSI air-entrained concrete in freeze-thaw zones, 4" compacted gravel base, vapor barrier, and thickened perimeter edges (add ~1.5 extra yards for monolithic turndowns).
Supply-House Order Summary: 6.79 cu yd (w/ 10% waste) · Ready-mix truck required. Pricing this job for a paying client? Plug these exact material costs and crew hours into our Contractor Markup vs. Gross Margin Calculator → so overhead never eats your net profit.
Tools trusted by US concrete, roofing, fencing, and landscape crews. Partner links keep JobCostMath free (disclosure).
Turn material takeoffs into professional good-better-best customer quotes with built-in margin tracking, automated follow-ups, and one-click deposit collection.
Track crew labor hours, material receipts, dispatch routes, and customer financing offers from your phone so job margins never erode in the field.
Generate live Certificates of Insurance (COI) for residential concrete, fencing, and roofing jobs in minutes — tailored for solo trades and growing crews.
Standard US estimating quantities for a 20×20 Two-Car Garage Slab (5" Thick) are 6.79 cu yd (w/ 10% waste) · Ready-mix truck required. Adjust dimensions or waste allowance in the live calculator above if your site has irregular grades or extra cutouts.
Direct materials typically run $1,180–$1,550 (concrete only), whereas a turnkey licensed contractor bid including site prep, labor burden, equipment, overhead, and warranty typically falls around $4,200–$6,800.
Always check utility locates (call 811 free before digging), local permit fees, dump/haul-away disposal fees for excavated soil or old roofing tear-off, and minimum delivery charges from local supply houses.