Live Slab Takeoff & Ready-Mix Breakeven Estimator

Walkways/patios: 4" · Driveways/garages: 5"–6".
Always keep 10% buffer for uneven compacted gravel grades.
Total Volume2.61 yd³
80-lb Bags (0.60 ft³)118 bags
60-lb Bags (0.45 ft³)157 bags
40-lb Bags (0.30 ft³)235 bags

Official Quikrete Concrete Bag Yield Standards

One cubic yard equals exactly 27 cubic feet. Dividing total slab cubic feet (including 10% subgrade/spillage contingency) by manufacturer bag yield determines your exact pallet count:

Cubic Yards = (Length_ft × Width_ft × (Depth_in / 12) / 27) × (1 + Waste%) 80-lb Bag = 0.60 cu ft -> 45 bags per cubic yard (3,600 lbs dry mix) 60-lb Bag = 0.45 cu ft -> 60 bags per cubic yard (3,600 lbs dry mix) 40-lb Bag = 0.30 cu ft -> 90 bags per cubic yard (3,600 lbs dry mix)

Quick Slab Volume Reference (Includes +10% Waste)

Slab Footprint4" Depth Volume80-lb BagsRecommended Delivery Method
8×10 ft (80 sq ft)1.09 yd³49 bagsDrum mixer or 1.25-yd metered trailer
10×10 ft (100 sq ft)1.36 yd³62 bagsBorderline — metered truck saves 4 hrs
12×16 ft (192 sq ft)2.61 yd³118 bagsReady-mix truck strongly recommended
20×20 ft (400 sq ft)5.43 yd³245 bagsReady-mix truck required (no short-load fee!)

Read our full field cost guide: Ready-Mix Truck vs. Bagged Concrete Breakeven Study →

Contractor Quoting, Scheduling & Liability Software

Tools trusted by US concrete, roofing, fencing, and landscape crews. Partner links keep JobCostMath free (disclosure).

Quoting & CRM

Jobber Field Service Software

Fast Estimates

Turn material takeoffs into professional good-better-best customer quotes with built-in margin tracking, automated follow-ups, and one-click deposit collection.

Free TrialTry Jobber
Home Services

Housecall Pro for Contractors

Job Costing

Track crew labor hours, material receipts, dispatch routes, and customer financing offers from your phone so job margins never erode in the field.

Pro EstimatingExplore Plans
Trade Coverage

Next General Liability Insurance

Instant COI

Generate live Certificates of Insurance (COI) for residential concrete, fencing, and roofing jobs in minutes — tailored for solo trades and growing crews.

Online QuoteCheck Coverage

Frequently Asked Questions

How many 80-lb bags of Quikrete equal 1 cubic yard of concrete?

Exactly 45 bags of 80-lb concrete mix yield 1.0 cubic yard (27 cu ft), since each 80-lb bag yields 0.60 cubic feet. With a 10% waste margin, plan on 50 bags per net cubic yard.

Why should I always add 10% waste to concrete slab calculations?

A 1/2-inch dip across a compacted gravel sub-base adds 12.5% more volume on a 4-inch slab — ordering 10% extra prevents the disaster of running dry halfway through screeding.

How much does a concrete ready-mix truck short-load fee cost?

Most US batch plants assess a $150–$250 short-load delivery fee for orders under 4 to 5 cubic yards; even with that fee, ready-mix usually beats bags above 1.75–2.0 cubic yards.

How thick should a residential driveway or garage concrete slab be?

Standard pedestrian sidewalks and patios are 4 inches thick, whereas residential driveways and garage slabs carrying pickups or SUVs should be 5 to 6 inches thick over 4 inches of compacted crushed stone.