Construction Takeoff & Contractor Estimating Guides
Straightforward trade accounting and material math built to stop under-ordering and unprofitable quoting.
Bid Profitability
Read Field Guide →Contractor Markup vs. Gross Margin: The $40k Profit Leak
Why bidding 25% markup only produces 20% gross margin, how overhead eats thin quotes, and the exact divisor formula that protects net profit.
Concrete Math
Read Field Guide →Ready-Mix Truck vs. Bagged Concrete Breakeven Guide
Compare delivered ready-mix truck pricing, short-load fees, pallet labor hours, and cured PSI strength across 0.5 to 10 cubic yard pours.
Roof Estimating
Read Field Guide →Roof Pitch Multipliers & Steep-Slope Shingle Estimating
Master the complete 2/12–12/12 pitch multiplier table, gable vs hip waste percentages, starter/ridge accessories, and steep-charge tiers.